SAP ECC6.0迁移升级到EHP6 on HANA过程

Posted

tags:

篇首语:本文由小常识网(cha138.com)小编为大家整理,主要介绍了SAP ECC6.0迁移升级到EHP6 on HANA过程相关的知识,希望对你有一定的参考价值。

# ./STARTUP confighostagent QAS

**** HOST detected as SAPQAS

**** The root directory to SUM is /usr/sap/QAS/SUM

**** Checking SID parameter[QAS] and parsed one: QAS

**** The SUM directory is under SID /usr/sap/$[SID:#required]/SUM

**** The saphostagent command would be /usr/sap/$[SID:#required]/SUM/sdt/exe/SLP

rotocol.sh

**** Set root:sapsys as owner of /usr/sap/hostctrl/exe/operations.d and /usr/sap

/hostctrl/exe/descriptors.d

**** Set root user and root group as owner of files in /usr/sap/hostctrl/exe/ope

rations.d and /usr/sap/hostctrl/exe/descriptors.d

**** Configuring SUM Abap:  /usr/sap/QAS/SUM/abap/SUMSTART confighostagent RESTA

RTSHA=no ****

**** SUM ABAP: https://SAPQAS:1129/lmsl/sumabap/QAS/doc/sluigui****

**** SUM benchmark tool: https://SAPQAS:1129/lmsl/migtool/QAS/doc/sluigui****

**** SUM Java: https://SAPQAS:1129/lmsl/sumjava/QAS/index.html****

**** SUM Dual stack: https://SAPQAS:1129/lmsl/sumjava/QAS/dual.html****

**** SUM Observer:https://SAPQAS:1129/lmsl/sumobserver/QAS/monitor/index.html*

***

**** Restarting SAP Host Agent ****

-> Start /usr/sap/hostctrl/exe/saphostexec pf=/usr/sap/hostctrl/exe/host_profile

<-

start hostcontrol using profile /usr/sap/hostctrl/exe/host_profile

**** SAP Host Agent has been restarted ****

**** You are using SAP Host Agent version: ****

**** hostagent release: 7.21 ****

**** hostagent patch number: 17 ****

**** Please check the central SUM note whether this SAP Host Agent version is su

fficient for SUM operation ****

#

 技术分享

替换过期crlbag.p7s

 技术分享


开始解压文件到EPS/IN,约50G文件

 技术分享

技术分享

 技术分享

技术分享

 技术分享

技术分享

 

技术分享技术分享

技术分享

DBATL720O10_42-20005243.SAR

解压brconnectSUM目录exe,错误消失

技术分享

技术分享

技术分享

alter tablespace PSAPSR3 add datafile ‘/oracle/QAS/sapdata3/sr3_26/sr3.data26‘ size 1000M autoextend on next 20M maxsize 10000M, ‘/oracle/QAS/sapdata3/sr3_27/sr3.data27‘ size 1000M autoextend on next 20M maxsize 10000M‘; 


 

 

警告:


Missing SAP Notes:

0001142128

0001158660

0001224011

0001247451

0001256384

0001263115

0001321756

0001354957

0001390993

0001399760

0001431044

0001462364

0001466928

0001488040

0001609895

0001614802

0001680583

0001719375

0001719977

0001861585

0002045835

0001714734

0001142128

0001488040

0002344014

0002222916

0002260116

0001160950

0001250481

0001279687

使用snote将以上note打进去 

技术分享 

/DVD/HDB_CLIENT_AIX_PPC64

这里是输入HDBclient安装源文件,并不需要安装client,权限更改


 技术分享

Target System License /DVD/license/QAS.txt

原系统的永久key

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

保持当前版本,next返回上一步,不勾选add on

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享


brspace -function tscreate -tablespace PSAPSR3731 -class none -data both -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tscreate -tablespace PSAPSR3731 -class none -data both -size 200 -incrsize 200 -maxsize 10000 -autoextend yes

 

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 14388 -autoextend yes

# brspace -function tsextend -tablespace PSAPSR3731  -size 200 -incrsize 200 -maxsize 22077 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 32000 -autoextend yes

brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 917 -autoextend yes

# brspace -function tsextend -tablespace PSAPSR3 -size 200 -incrsize 200 -maxsize 9017 -autoextend yes

 

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享


smq1清除队列lbwg删除队列

 技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

abap/heap_area_dia = 64000000000

abap/heap_area_nondia = 64000000000

ztta/roll_area = 300000000

ztta/roll_extension = 64000000000

abap/heap_area_total = 64000000000

 

参考link https://wiki.scn.sap.com/wiki/display/SL/Starting+and+stopping+the+shadow+instance+manually

手动重启影子实例

cd <update directory>/abap/bin

 ./SAPup stopshd    

./SAPup startshd     

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

accept


技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

 技术分享

目标系统时间比源系统慢了整整1个小时,调整后正常下一步

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

找到一个note,按照solution进行处理即可

技术分享


技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

技术分享

几个升级参考的几个link:

Optimizing DMO Performance https://blogs.sap.com/2015/12/15/optimizing-dmo-performance/

DMO: optimizing system downtime https://blogs.sap.com/2015/03/17/dmo-optimizing-system-downtime/

DMO with SUM – Tips and Tricks https://blogs.sap.com/2015/11/23/sum-with-dmo-tips-and-tricks/

Database Migration Option (DMO) of SUM – Introduction https://blogs.sap.com/2013/11/29/database-migration-option-dmo-of-sum-introduction/

DMO: downtime optimization by migrating app tables during uptime (preview)  https://blogs.sap.com/2014/09/08/dmo-downtime-optimization-by-migrating-app-tables-during-uptime-preview/

本文出自 “jenvid” 博客,请务必保留此出处http://jenvid.blog.51cto.com/239104/1880086

以上是关于SAP ECC6.0迁移升级到EHP6 on HANA过程的主要内容,如果未能解决你的问题,请参考以下文章

SAP Commerce/Hybris 升级多个版本

ISPN000580:无法迁移持久数据 - 升级到 jboss/keycloak 13.0.1

SAP 官网中文帮助文件&BP中文资料汇总

SAP订单编排和流程增强概述

山石网科-Hillstone-HA(高可用)active/standby固件版本升级终结经验篇

WLC HA 升级步骤