POJ1325(最小顶点覆盖)
Posted vCoders
tags:
篇首语:本文由小常识网(cha138.com)小编为大家整理,主要介绍了POJ1325(最小顶点覆盖)相关的知识,希望对你有一定的参考价值。
Machine Schedule
Time Limit: 1000MS | Memory Limit: 10000K | |
Total Submissions: 14429 | Accepted: 6153 |
Description
As we all know, machine scheduling is a very classical problem in computer science and has been studied for a very long history. Scheduling problems differ widely in the nature of the constraints that must be satisfied and the type of schedule desired. Here we consider a 2-machine scheduling problem.
There are two machines A and B. Machine A has n kinds of working modes, which is called mode_0, mode_1, ..., mode_n-1, likewise machine B has m kinds of working modes, mode_0, mode_1, ... , mode_m-1. At the beginning they are both work at mode_0.
For k jobs given, each of them can be processed in either one of the two machines in particular mode. For example, job 0 can either be processed in machine A at mode_3 or in machine B at mode_4, job 1 can either be processed in machine A at mode_2 or in machine B at mode_4, and so on. Thus, for job i, the constraint can be represent as a triple (i, x, y), which means it can be processed either in machine A at mode_x, or in machine B at mode_y.
Obviously, to accomplish all the jobs, we need to change the machine‘s working mode from time to time, but unfortunately, the machine‘s working mode can only be changed by restarting it manually. By changing the sequence of the jobs and assigning each job to a suitable machine, please write a program to minimize the times of restarting machines.
There are two machines A and B. Machine A has n kinds of working modes, which is called mode_0, mode_1, ..., mode_n-1, likewise machine B has m kinds of working modes, mode_0, mode_1, ... , mode_m-1. At the beginning they are both work at mode_0.
For k jobs given, each of them can be processed in either one of the two machines in particular mode. For example, job 0 can either be processed in machine A at mode_3 or in machine B at mode_4, job 1 can either be processed in machine A at mode_2 or in machine B at mode_4, and so on. Thus, for job i, the constraint can be represent as a triple (i, x, y), which means it can be processed either in machine A at mode_x, or in machine B at mode_y.
Obviously, to accomplish all the jobs, we need to change the machine‘s working mode from time to time, but unfortunately, the machine‘s working mode can only be changed by restarting it manually. By changing the sequence of the jobs and assigning each job to a suitable machine, please write a program to minimize the times of restarting machines.
Input
The input file for this program consists of several configurations. The first line of one configuration contains three positive integers: n, m (n, m < 100) and k (k < 1000). The following k lines give the constrains of the k jobs, each line is a triple: i, x, y.
The input will be terminated by a line containing a single zero.
The input will be terminated by a line containing a single zero.
Output
The output should be one integer per line, which means the minimal times of restarting machine.
Sample Input
5 5 10 0 1 1 1 1 2 2 1 3 3 1 4 4 2 1 5 2 2 6 2 3 7 2 4 8 3 3 9 4 3 0
Sample Output
3
思路:因为两个机器一开始工作在0号模式,所以(u,0)、(0,v)不需要填边。
#include <cstdio> #include <vector> #include <cstring> using namespace std; const int MAXN=205; vector<int> arc[MAXN]; int n,m,k; int match[MAXN],vis[MAXN]; bool dfs(int u) { for(int i=0;i<arc[u].size();i++) { int to=arc[u][i]; if(!vis[to]) { vis[to]=1; int w=match[to]; if(w==-1||dfs(w)) { match[to]=u; match[u]=to; return true; } } } return false; } int max_flow() { int ans=0; memset(match,-1,sizeof(match)); for(int i=1;i<n;i++) { if(match[i]==-1) { memset(vis,0,sizeof(vis)); if(dfs(i)) { ans++; } } } return ans; } int main() { while(scanf("%d",&n)!=EOF&&n!=0) { scanf("%d%d",&m,&k); for(int i=0;i<MAXN;i++) arc[i].clear(); for(int i=0;i<k;i++) { int u,v; scanf("%*d%d%d",&u,&v); if(u==0||v==0) continue; v+=n; arc[u].push_back(v); arc[v].push_back(u); } int res=max_flow(); printf("%d\n",res); } return 0; }
以上是关于POJ1325(最小顶点覆盖)的主要内容,如果未能解决你的问题,请参考以下文章
POJ - 1325 Machine Schedule 二分图 最小点覆盖
POJ 1325 && ZOJ 1364--Machine Schedule二分图 && 最小点覆盖数